Vestas, Mitsubishi receive 860 MW offshore wind order in the UK
The order, placed by Triton Knoll Offshore Wind Farm Ltd., comprises 90 V164-9.5 MW turbines.
Read MoreProduct tanker vessel to test rotor sails
Two Norsepower composite Rotor Sails have been installed onboard Maersk Pelican, a Maersk Tankers Long Range 2 (LR2) product tanker vessel.
Read MoreMusings about heat shields
NASA’s Orion capsule employs an ablative material based on the same heat shield coating used for the Apollo missions.
Read MoreFlexDrill CNC introduces TRD family of vertical machining centers
TRD family of vertical machining centers which drills, mills, taps and bevels large or long parts.
Read MoreAMRC to add ultrasonic assisted machine tool
New composite machine tool will be the first of its size to be fitted with an ultrasonic-capable spindle for use in five-axis machining applications.
Read MoreKrauss-Maffei opens its doors to public
The company will welcome visitors to its Florence, KY, US facility for it’s Manufacturing Day celebration Thursday Oct. 11.
Read MoreSeemann Composites opens submarine bow dome production facility
The company has constructed a facility for producing composite bow domes for the Navy’s Columbia Class Ballistic Missile Submarine.
Read MoreStaufen and Schuler join forces in North America
The two companies have combined efforts to provide consulting services and process optimization for press shops.
Read MoreRecyclable thermoplastic composites liftgates offer weight savings
Magna to launch two more thermoplastic liftgates this year.
WatchDistributed wind market surpasses 1 GW milestone
US distributed wind market has surpassed the 1 GW milestone with 81,000 turbines generating power across 50 states.
Read MoreNew licensing model offers access to Altair's solidThinking software suite and cloud resources
solidThinking Units (sTUs) will enable small and midsize business (SMB) customers and the design engineering community to drive product innovation with simulation.
Read MoreVestas to cease production at facility in León, Spain
The move was prompted by a decreasing demand for the 2 MW wind turbine platform in Europe.
Read More