Goldwind announces new GW 6S offshore smart wind turbine platform
First commercial deployment of offshore turbines for China's largest wind turbine OEM.
Xinjiang Goldwind Science & Technology Co. Ltd. has launched its latest GW6S offshore platform at last month's China Wind Power exhibition. The 6S turbine platform includes three new offshore wind turbines. The turbines are available with rotor diameters ranging from 154 to 171 meters and are a direct evolution of Goldwind's permanent magnet direct drive (PMDD) turbine technology.
In September, the first blades for the 6.7MW offshore prototype with a length of 75.1 meters were produced. A prototype of the GW154/6.7MW will be installed in early 2018 and is designed for wind class I areas off the Fujian and Guangdongcoast, east of China.
The turbine's expected commercial deployment is during the first quarter of 2018 and target offshore markets outside of China include Japan, South Korean and, later, Europe.
Related Content
-
Composites end markets: Batteries and fuel cells (2024)
As the number of battery and fuel cell electric vehicles (EVs) grows, so do the opportunities for composites in battery enclosures and components for fuel cells.
-
Drag-based wind turbine design for higher energy capture
Claiming significantly higher power generation capacity than traditional blades, Xenecore aims to scale up its current monocoque, fan-shaped wind blades, made via compression molded carbon fiber/epoxy with I-beam ribs and microsphere structural foam.
-
Novel dry tape for liquid molded composites
MTorres seeks to enable next-gen aircraft and open new markets for composites with low-cost, high-permeability tapes and versatile, high-speed production lines.