Airtech
Published

Horizon Aircraft completes wind tunnel transition flight testing

The company anticipates that its Cavorite X5 hybrid eVTOL will be ready for full-scale flight tests in 2025.

Share

Horizon Aircraft composite air taxi wind tunnel test
Photo Credit: Horizon Aircraft

Horizon Aircraft (Toronto, Ontario), developer of hybrid electric vertical take-off and landing (eVTOL) aerial vehicles, announces that it has completed initial transition flight testing of its Cavorite X5 50% scale eVTOL prototype in the world class ACE Climatic Wind Tunnel.

Brandon Robinson, CEO of Horizon Aircraft, says, “Aircraft performance exceeded our expectation. We explored forward speeds of up to almost 100 kilometers/hour, measuring aerodynamic forces, control authority, and mechanical system function with the wings open at varying fan speeds. We were particularly happy with pitch and roll stability and control throughout the entire transition envelope, as well as the embedded fan performance. Having real-world test results match our detailed predictions was further endorsement of our world class engineering. We can now use these results to refine our CFD modeling and further de-risk the outdoor transition flight test program that is beginning soon.”

Horizon says its innovative and patented hybrid eVTOL concept enables the aircraft to fly 98% of its mission in a very low-drag configuration like a traditional aircraft and is one of the only eVTOL aircraft currently able to do so. Flying most of the mission as a normal aircraft is safer, more efficient and will be easier to certify than radical new eVTOL designs, the company claims. The aircraft can also operate in short takeoff and landing (STOL) or conventional takeoff and landing (CTOL) modes. The full-scale aircraft will be powered by a hybrid electric architecture that can recharge the battery array in-flight while providing additional system redundancy and flexibility.

Horizon Aircraft will soon move to outdoor transition flight testing as the company continues the detailed design of its full-scale aircraft, anticipating final assembly for flight testing in 2025.

Related Content

Zone 5 CLEAVER
Coast-Line Intl
Airtech
Large Scale Additive Manufacturing
IRIS Ai-enabled Camera
CIJECT machines and monitoring systems
Alpha’s Premier ESR®
Airtech
Airtech International Inc.