Vestas selected to supply turbines for offshore wind project
Vestas will supply 138 V236-15.0 MW turbines for Empire Offshore Wind’s 2.1 GW offshore wind projects, which are located 15-30 miles off the coast of Long Island, New York, U.S.
Vestas (Aarhus, Denmark) has been named as the preferred turbine supplier for Empire Offshore Wind, a joint venture between Equinor (Stavanger, Norway) and BP (London, U.K.). Vestas will supply 138 V236-15.0 megawatt (MW) turbines for the 2.1 gigawatt (GW) Empire Wind 1 and Empire Wind 2 offshore wind projects, located 15-30 miles off the coast of Long Island, N.Y., U.S.
With this project, New York, Equinor, BP and Vestas together are said to be bringing the country closer to achieving the current president’s goal of 30 GW of offshore wind capacity installed by 2030, as well as New York’s goal of installing 9 GW of offshore wind capacity by 2035.
The tower sections for Empire Wind 1 and 2 are planned to be sourced from the Marmen/Welcon plant, which is being developed in Port of Albany. For staging of turbine components, Vestas will use the upgraded port at South Brooklyn Marine Terminal, developing a New York-based supply chain to provide a comprehensive set of services in the staging, pre-assembly and installation activities. Vestas currently has more than 1,000 suppliers in the U.S. that support its onshore business.
In addition, Vestas says it will deliver a comprehensive multi-year solution to service the wind farm when operational, with the goal to establish a New York-based service organization providing local employment opportunities.
Vestas plans to disclose the order in a company announcement in accordance with the company’s disclosure policy — if and when the agreement with Empire materializes in a firm order for the company.
Related Content
-
Drag-based wind turbine design for higher energy capture
Claiming significantly higher power generation capacity than traditional blades, Xenecore aims to scale up its current monocoque, fan-shaped wind blades, made via compression molded carbon fiber/epoxy with I-beam ribs and microsphere structural foam.
-
Novel composite technology replaces welded joints in tubular structures
The Tree Composites TC-joint replaces traditional welding in jacket foundations for offshore wind turbine generator applications, advancing the world’s quest for fast, sustainable energy deployment.
-
RTM, dry braided fabric enable faster, cost-effective manufacture for hydrokinetic turbine components
Switching from prepreg to RTM led to significant time and cost savings for the manufacture of fiberglass struts and complex carbon fiber composite foils that power ORPC’s RivGen systems.