CompositesWorld News
RWE Sofia offshore wind farm to use Siemens RecyclableBlades
Large offshore wind farm in the U.K. will have 44 out of 100 of its wind turbines equipped with recyclable composite blades, the largest order to date.
Read MoreResearch predicts first commercial eVTOL passenger routes, applications
A new survey commissioned by Horizon Aircraft asked 100 professionals when they think the first UAM passenger routes will be operational, and what uses would be considered the most practical.
Read MoreMcLaren celebrates 10 years of the McLaren P1 hybrid hypercar
Lightweight carbon fiber construction, Formula 1-inspired aerodynamics and high-performance hybrid powertrain technologies hallmark this hybrid vehicle, serve as a springboard for new race cars.
Read MoreArcher nears completion of first Midnight aircraft build
All major aerostructures and systems have been built and installed to begin pilot flight test operations with the conforming composite aircraft in early 2024.
Read MoreLimosa taps Airborne composites expertise to build LimoConnect
Airborne’s capabilities will support airframe prototyping, automated production of the Limosa LimoConnect eVTOL + eCTOL aircraft from prototype through to serial production to help meet 2028 entry-into-service goals.
Read MorePilot program turns EOL wind blades to liners for pipe infrastructure
TPI Composites, Tex-Tech and Carbon Rivers partner to process wind blades, pyrolyze the material and use the recovered glass fibers to give new life to damaged existing pipelines.
Read MoreContinuous Composites unveils commercial CF3D Enterprise machine
Purchased by the University of Illinois Urbana-Champaign, the milestone was celebrated during a ribbon-cutting ceremony and technical symposium, highlighting the system’s ability to accelerate the R&D of composites manufacturing.
Read MoreCityAirbus NextGen to be developed for future medical missions in Norway
Airbus and the Norwegian Air Ambulance Foundation partner to measure the added value of eVTOL aircraft for medical use cases across Norway.
Read MoreBuilding code requirements renewed for CarbonCast wall panels
ICC-ES ESR#2953 renewal revalidates performance and compliance of AltusGroup precast wall assembly featuring C-Grid carbon fiber grid connector and rigid foam insulation.
Read MorePlanefibra translucent composite tiles target natural lighting, energy savings
More than reducing the electricity bill, companies can improve their work environment by including these GFRP tiles, which have high thermal resistance, on their buildings.
Read More