CompositesWorld News

Bedford names OSCO safety exclusive ReadySeries supplier

Adding GFRP ReadySeries to OSCO’s suite of safety solutions provides customers with a one-stop shop experience to address critical safety needs. 

Read More
Carbon Fibers

ILAuNCH Trailblazer project to use AM technologies to produce large-scale composite rockets

ILAuNCH partnership, joined by ANU and New Frontier Technologies, will develop a qualified manufacturing process that will directly contribute to the development of launch vehicle development.

Read More
Wind/Energy

Kineco Exel Composites India to supply carbon fiber planks for wind 

Multi-year agreement between the joint venture and a South Asian wind turbine manufacturer contributes to composite spar cap development.

Read More
Aerospace

FAA investigates fresh concerns over 787 aircraft production

A Boeing engineer has claimed that the Dreamliner’s composite fuselage assembly process is flawed, raising questions about the aircraft’s structural integrity.

Read More
Automotive

MAN Truck & Bus expands zero-emission vehicle portfolio

Small truck series with hydrogen combustion featuring Type 4 tanks is planned for 2025, complementing the commercial vehicle manufacturer’s battery-electric portfolio.

Read More
Space

Rocket Lab receives U.S. Space Force launch contract for DOD operations

The mission will be Rocket Lab’s third for the U.S. Space Force, further strengthening the use of its Electron carbon fiber composite rocket as a reliable and responsive small launch vehicle.

Read More
Aerospace

Airbus forecasts $45 billion commercial aircraft services market value for U.S. by 2042

Global Services Forecast suggests a 45% increase driven by a rise in annual air traffic, fleet growth and more digitally enabled and connected aircraft.

Read More

EHang secures production certification from CAAC

With production, type and standard airworthiness certification under its belt the AAM company is cleared for mass production of the EH216-S.

Read More

Archer successfully completes multiple battery pack drop tests for Midnight aircraft

Proprietary battery pack design integrated into a composite battery enclosure passed extreme impact scenario simulations, setting the stage for upcoming for-credit testing with the FAA.

Read More
Recycling

Acciona to build wind blade recycling plant in Spain by 2025

Waste2Fiber facility will use a proprietary thermal method to separate wind blade materials for reuse and will have a processing capacity of 6,000 tons of material/year.

Read More
Advanced Composite Training Programs
Venango Machine Co. Inc.
High-Density Urethane (HDU) boards
Thermoplastic Composite Laminates
Airtech International Inc.
Toray Advanced Composites