World's most powerful wind turbine installed in Scotland's Aberdeen Bay
Deployment of the first of 11 innovative turbines for Vattenfall’s European Offshore Wind Deployment Centre marks an offshore wind industry breakthrough.
The world’s most powerful single turbine was successfully installed yesterday April 9 as the first of 11 turbines to be deployed Vattenfall’s (London, UK) ground-breaking European Offshore Wind Deployment Centre (EOWDC) in Scotland’s Aberdeen Bay.
In addition, Vattenfall today confirmed that it is one of two turbines that have been significantly enhanced with further internal power modes to generate more clean energy from the EOWDC. The two turbines have each increased from 8.4MW to 8.8MW and yesterday’s installation represents the first time an 8.8 MW model has been deployed commercially in the offshore wind industry.
Together with the nine 8.4MW turbines, this substantially boosts the EOWDC’s output to 93.2MW. This allows the facility to produce the equivalent of more than 70% of Aberdeen’s domestic electricity demand and annually displace 134,128 tonnes of CO2.
Yesterday’s feat of engineering comes less than two weeks after the first of the EOWDC’s game-changing suction bucket jacket foundations was successfully installed. The EOWDC is the first offshore wind project to deploy the foundations at commercial scale and pairing them with the world’s most powerful turbines represents another industry first.
Gunnar Groebler, Vattenfall’s head of Business Area Wind, says, “The turbines for the EOWDC, Scotland’s largest offshore wind test and demonstration facility, help secure Vattenfall’s vision to be fossil fuel free within one generation. The EOWDC, through its innovative approach to cost reduction and pioneering technologies, leads the industry drive towards generating clean and competitive wind energy power – one that will reinforce Scotland’s global energy status.”
MHI Vestas (Aarhus, Denmark) has specially designed the V164-8.4 MW and V164-8.8 MW turbines which all have a tip height of 191 metres. Each blade is 80m long - slightly taller than Aberdeen’s Marischal College – and the 164m rotor has a circumference larger than that of the London Eye’s.
EOWDC project director at Vattenfall, Adam Ezzamel, says, “The first turbine installation is a significant achievement and credit to the diligence and engineering know-how of the project team and contractors. For it to be one of the 8.8MW models makes it an even more momentous moment because it further endorses the EOWDC as a world-class hub of offshore wind innovation.
“We are very excited by the cutting-edge technology deployed on all the turbines and it is remarkable that just one rotation of the blades can power the average UK home for a day.”
MHI Vestas chief operations officer, Flemming Ougaard, says, “We are very pleased to have installed the first of 11 turbines at Aberdeen Bay. Our collaboration with Vattenfall not only provides clean wind energy for the UK, but also is an important opportunity for us to gain valuable experience with several different technologies. We look forward to the successful installation of the remaining turbines.”
The turbines are being transported from Esbjerg, Denmark to Aberdeen by Swire Blue Ocean’s (København, Denmark) vessel, the Pacific Orca, where they will be lifted into position on the installed foundations. The Pacific Orca is believed to be the world’s largest wind farm installation vessel.
Jean Morrison, chair of Aberdeen Renewable Energy Group (AREG, Aberdeen, Scotland), says, “The EOWDC is leading the way in terms of innovation for the offshore wind sector and will help enable the next generation of offshore wind. It’s a real coup for the region to have the world’s most powerful turbines on its doorstep and cements Aberdeen’s position as a major global energy city. It also will lead us to a greener future.”
Related Content
Kite-based energy system aims for high-output, low-impact wind energy
Netherlands-based startup Kitepower’s Falcon airborne wind energy (AWE) system deploys a fiberglass-intensive kite to generate wind energy with a low ground footprint.
Read MoreNovel dry tape for liquid molded composites
MTorres seeks to enable next-gen aircraft and open new markets for composites with low-cost, high-permeability tapes and versatile, high-speed production lines.
Read MorePlant tour: ÉireComposites, Galway, Ireland
An in-house testing business and R&D focus has led to innovative materials use and projects in a range of markets, from civil aerospace to renewable energy to marine.
Read MoreNovel composite technology replaces welded joints in tubular structures
The Tree Composites TC-joint replaces traditional welding in jacket foundations for offshore wind turbine generator applications, advancing the world’s quest for fast, sustainable energy deployment.
Read MoreRead Next
Plant tour: Teijin Carbon America Inc., Greenwood, S.C., U.S.
In 2018, Teijin broke ground on a facility that is reportedly the largest capacity carbon fiber line currently in existence. The line has been fully functional for nearly two years and has plenty of room for expansion.
Read More“Structured air” TPS safeguards composite structures
Powered by an 85% air/15% pure polyimide aerogel, Blueshift’s novel material system protects structures during transient thermal events from -200°C to beyond 2400°C for rockets, battery boxes and more.
Read MoreThe next-generation single-aisle: Implications for the composites industry
While the world continues to wait for new single-aisle program announcements from Airbus and Boeing, it’s clear composites will play a role in their fabrication. But in what ways, and what capacity?
Read More