World's most powerful wind turbine installed in Scotland's Aberdeen Bay
Deployment of the first of 11 innovative turbines for Vattenfall’s European Offshore Wind Deployment Centre marks an offshore wind industry breakthrough.
The world’s most powerful single turbine was successfully installed yesterday April 9 as the first of 11 turbines to be deployed Vattenfall’s (London, UK) ground-breaking European Offshore Wind Deployment Centre (EOWDC) in Scotland’s Aberdeen Bay.
In addition, Vattenfall today confirmed that it is one of two turbines that have been significantly enhanced with further internal power modes to generate more clean energy from the EOWDC. The two turbines have each increased from 8.4MW to 8.8MW and yesterday’s installation represents the first time an 8.8 MW model has been deployed commercially in the offshore wind industry.
Together with the nine 8.4MW turbines, this substantially boosts the EOWDC’s output to 93.2MW. This allows the facility to produce the equivalent of more than 70% of Aberdeen’s domestic electricity demand and annually displace 134,128 tonnes of CO2.
Yesterday’s feat of engineering comes less than two weeks after the first of the EOWDC’s game-changing suction bucket jacket foundations was successfully installed. The EOWDC is the first offshore wind project to deploy the foundations at commercial scale and pairing them with the world’s most powerful turbines represents another industry first.
Gunnar Groebler, Vattenfall’s head of Business Area Wind, says, “The turbines for the EOWDC, Scotland’s largest offshore wind test and demonstration facility, help secure Vattenfall’s vision to be fossil fuel free within one generation. The EOWDC, through its innovative approach to cost reduction and pioneering technologies, leads the industry drive towards generating clean and competitive wind energy power – one that will reinforce Scotland’s global energy status.”
MHI Vestas (Aarhus, Denmark) has specially designed the V164-8.4 MW and V164-8.8 MW turbines which all have a tip height of 191 metres. Each blade is 80m long - slightly taller than Aberdeen’s Marischal College – and the 164m rotor has a circumference larger than that of the London Eye’s.
EOWDC project director at Vattenfall, Adam Ezzamel, says, “The first turbine installation is a significant achievement and credit to the diligence and engineering know-how of the project team and contractors. For it to be one of the 8.8MW models makes it an even more momentous moment because it further endorses the EOWDC as a world-class hub of offshore wind innovation.
“We are very excited by the cutting-edge technology deployed on all the turbines and it is remarkable that just one rotation of the blades can power the average UK home for a day.”
MHI Vestas chief operations officer, Flemming Ougaard, says, “We are very pleased to have installed the first of 11 turbines at Aberdeen Bay. Our collaboration with Vattenfall not only provides clean wind energy for the UK, but also is an important opportunity for us to gain valuable experience with several different technologies. We look forward to the successful installation of the remaining turbines.”
The turbines are being transported from Esbjerg, Denmark to Aberdeen by Swire Blue Ocean’s (København, Denmark) vessel, the Pacific Orca, where they will be lifted into position on the installed foundations. The Pacific Orca is believed to be the world’s largest wind farm installation vessel.
Jean Morrison, chair of Aberdeen Renewable Energy Group (AREG, Aberdeen, Scotland), says, “The EOWDC is leading the way in terms of innovation for the offshore wind sector and will help enable the next generation of offshore wind. It’s a real coup for the region to have the world’s most powerful turbines on its doorstep and cements Aberdeen’s position as a major global energy city. It also will lead us to a greener future.”
Related Content
Novel composite technology replaces welded joints in tubular structures
The Tree Composites TC-joint replaces traditional welding in jacket foundations for offshore wind turbine generator applications, advancing the world’s quest for fast, sustainable energy deployment.
Read MoreRecycling end-of-life composite parts: New methods, markets
From infrastructure solutions to consumer products, Polish recycler Anmet and Netherlands-based researchers are developing new methods for repurposing wind turbine blades and other composite parts.
Read MoreComposites end markets: Energy (2024)
Composites are used widely in oil/gas, wind and other renewable energy applications. Despite market challenges, growth potential and innovation for composites continue.
Read MoreCollins Aerospace to lead COCOLIH2T project
Project for thermoplastic composite liquid hydrogen tanks aims for two demonstrators and TRL 4 by 2025.
Read MoreRead Next
VIDEO: High-volume processing for fiberglass components
Cannon Ergos, a company specializing in high-ton presses and equipment for composites fabrication and plastics processing, displayed automotive and industrial components at CAMX 2024.
Read MoreDeveloping bonded composite repair for ships, offshore units
Bureau Veritas and industry partners issue guidelines and pave the way for certification via StrengthBond Offshore project.
Read MorePlant tour: Daher Shap’in TechCenter and composites production plant, Saint-Aignan-de-Grandlieu, France
Co-located R&D and production advance OOA thermosets, thermoplastics, welding, recycling and digital technologies for faster processing and certification of lighter, more sustainable composites.
Read More