Out of Autoclave
FRP Two way Joist System The Answer For Cleanroom Concrete Flooring
When electronics giant Texas Instruments Inc. (TI, Dallas, Texas) spec'd the 200,000 ft2 (18,850m2) multistory cleanroom for its new semiconductor manufacturing facility, it needed to accommodate not only strict indoor air quality requirements but heavy structural loads as well. The cleanroom was designated as the
Read MoreJEC Composites 2006 Product Showcase
The buzz at the annual trade event in Paris? Business is good!
Read MoreLFRT Uncovers Hidden Value For New Jeep Vehicle
Long-fiber thermoplastic composite fulfills engineering and assembly plant requirements for multifunctional door module.
Read MoreMay Editorial
HPC at JEC (left to right): Sian Raynor, Dirk Weed, Judy Hazen, Sara Black and Mike Musselman. Everything one hears lately — whether it's reports from the recent SpeedNews Conference in L.A. (see News item, p. 20) or sales statistics and projections from aircraft manufacturers and associations (see News, pp. 21-22)
Read MoreApril editorial
Well, the suitcase is repacked for my third trip in as many weeks — it's conference and show season again. There's really no place like home, but the truth is that industry gatherings are how we network and become acquainted with new applications to cover. Tomorrow, I'm off to Budapest, Hungary for the 8th World
Read MoreComposite Rebar Speeds Tunneling Operations
Pultruded replacement for steel reinforcement in concrete clears path for more efficient use of boring machinery.
Read MoreSizing Up Fiber Sizings
What glass fiber users need to know about sizings, and how new sizing developments are enhancing the performance of glass-reinforced composites.
Read More