Automation

Automation

CAMX 2017 preview: DUO Robotic Solutions

DUO Robotic Solutions Inc. (Sterling Heights, MI, US) is introducing its DUO-Trim line, which offers robot selections for fixed and rotary tables, air and electric spindles, cold and ultrasonic knifes, traditional and high-volume vacuum solutions and others.

Read More
Out of Autoclave

Plant Tour: BENTELER SGL, Ort im Innkreis, Austria

High-volume CFRP structures pioneer makes industrialization and multimaterial assembly look easy.

Read More
Recycling

CRTC and IACMI to develop advanced carbon recycling equipment

Thanks to a new contract with IACMI, the CRTC will pioneer ways to automate processing of carbon prepreg scrap. This technology breakthrough is essential so recycled carbon fiber can be processed in high volumes, says CRTC.

Read More
Ketones

Preforming goes industrial: Part 2

Automated preforming isn’t only for 2D and 2.5D parts. Innovators are taking successful aim at building 3D preforms at production speeds.

Read More
Automation

Variable-axial composites open path to lighter composite structures

CFRP recurve bow riser demonstrates design and manufacturing approach with potential to cut weight vs. aluminum by 50-75% while increasing strength and stiffness.

Read More
Editorial

Addressing workforce challenges in the composites industry

Baby Boomers, workforce development and automation.

Read More

Automated Preforming, Part 3: Quilted Stratum Process

CW’s tour of Cetim and the QSP line which preforms multi-thickness thermoplastic materials in 40-90 seconds for composite parts with cycle times of 1-2 minutes.

Watch
Aerospace

Automated Preforming, Part 2: Glide Forming

Flat layups are shaped into stringers with different cross-sections, lengths, thicknesses and curvatures using a single machine at rates up to 10 mm per second.

Watch
Pultrusion

Preforming goes industrial: Part 1

ATL and AFP-based preforming options now abound for processing dry and/or impregnated reinforcements as quickly as 1 minute or less with potential yearly part yields in the millions.

Watch
Aerospace

Automated Preforming, Part 1: Numbers and Landscape

CW’s multi-blog series on preforming begins with an overview and quick look at the numbers: 1-minute take time, 10-15 seconds per layer, 490-kg/hr and 3.5 million parts/year. Are you ready for serial CFRP production?

Read More
Airtech
Eliminate Quality Escapes  With LASERVISION AI
Smart Tooling
NewStar Adhesives - Nautical Adhesives
Advert for lightweight carrier veils used in aero
CompositesWorld
Industrial CNC Routers
Carbon Fiber 2024
Airtech International Inc.